PROJECT EXAMPLES
PETROCHEMICAL PLANT -- Houston,
Texas
Stabilized and removed over 75,000 cubic yards of sludge from five lagoons within 45 days
in order to meet a closure deadline.
SUPERFUND SITE -- Crosby, Texas
Installed and operated a Reverse Osmosis system to treat over 40 million gallons of high
TOC contaminated water for discharge directly into the San Jacinto river system.
STEEL MILL -- Chicago, Illinois
Dewatered over 100,000 cubic yards of materials from an intake flume using 2.5 meter belt
presses. Project invlolved taking over operations of the plant clarifier system and
handling dredge flows in excess of 3,000 gpm and over 900 cubic yards of dewatered cake on
a daily basis.
SEAFOOD PROCESSING PLANT -- Cape
May, New Jersey
Designed, manufactured and installed two 180 gpm DAF units within 60 dys to meet a
compliance deadline.
NUCLEAR WEAPONS FACILITY -- Rocky
Flats, Colorado
Assisted in the removal of radioactive contaminated pond water and sludge.
COKE PLANT -- Chicago, Illinois
Assisted in the design and installation of a hazardous chemical precipitation system.
System was assembled, installed and operating within ten days of client request.
System complied with client's requirements for patent secrecy and avoided fines of
up to $25,000 per day for wastewater non-compliance.
PAPER PLANT -- Crossett, Arkansas
Designed, installed and operated a belt press dewatering system to handle round-the-clock
wastewater flows of over 2,000 gpm. Project involved handling clarifier solids
removal, transport of over 450 yards of cake on a daily basis and control of land farm
activities.
EPA PCB REMEDIATION -- Manistique,
U.P. Michigan
Installed and operated a belt press dewatering system to dewater PCB contaminated sludge
from Lake Michigan.