LEFCO's background is extensive and varied.  Our experience enables us to provide our customers with fast solutions to problems which need to be resolved with minimal delay.

PROJECT EXAMPLES

PETROCHEMICAL PLANT -- Houston, Texas
Stabilized and removed over 75,000 cubic yards of sludge from five lagoons within 45 days in order to meet a closure deadline.

SUPERFUND SITE -- Crosby, Texas
Installed and operated a Reverse Osmosis system to treat over 40 million gallons of high TOC contaminated water for discharge directly into the San Jacinto river system.

STEEL MILL -- Chicago, Illinois
Dewatered over 100,000 cubic yards of materials from an intake flume using 2.5 meter belt presses.  Project invlolved taking over operations of the plant clarifier system and handling dredge flows in excess of 3,000 gpm and over 900 cubic yards of dewatered cake on a daily basis.

SEAFOOD PROCESSING PLANT -- Cape May, New Jersey
Designed, manufactured and installed two 180 gpm DAF units within 60 dys to meet a compliance deadline.

NUCLEAR WEAPONS FACILITY -- Rocky Flats, Colorado
Assisted in the removal of radioactive contaminated pond water and sludge.

COKE PLANT -- Chicago, Illinois
Assisted in the design and installation of a hazardous chemical precipitation system.   System was assembled, installed and operating within ten days of client request.   System complied with client's requirements for patent secrecy and avoided fines of up to $25,000 per day for wastewater non-compliance.

PAPER PLANT -- Crossett, Arkansas
Designed, installed and operated a belt press dewatering system to handle round-the-clock wastewater flows of over 2,000 gpm.  Project involved handling clarifier solids removal, transport of over 450 yards of cake on a daily basis and control of land farm activities.

EPA PCB REMEDIATION -- Manistique, U.P. Michigan
Installed and operated a belt press dewatering system to dewater PCB contaminated sludge from Lake Michigan.

 

For more information, to talk to a service engineer, or to request a quotation, click here

 

Home ]Dewatering ] Equipment Rental ] Sludge Handling ] [ Project References ] Company Profile ] Contact ]

LEFCO
Environmental Services
330 Rayford Road #352
Spring, Texas  77386

Toll Free
1-800-533-2688

Phone: (281) 465-0930        Fax: (281) 465-0929